Thunder Gold intersects 232.5 m at 0.450 g/t gold at Tower Mountain project in Ontario
Bitget2026/09/28 11:32- Thunder Gold reported infill drilling at its Tower Mountain gold project near Thunder Bay, Ontario, ahead of a planned December resource update.
- Hole TM26-217 cut 232.5 meters grading 0.450 g/t gold from 360 meters, including 33.0 meters at 1.383 g/t.
- Results support modeled sub-vertical continuity along the Bench–3738–Ellen corridor used in the January 19, 2026 mineral resource estimate.
- Six infill holes returned 2,040 meters averaging 0.445 g/t gold, with drilled grades trending 12.5% above model on a weighted basis.
- Management flagged mineralization extending more than 100 meters below the current optimized pit limit, with deeper holes suggesting higher grades.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
UK 10-Year Bonds Auction Today: May Hammer at 5.41%, Auction Yield Could Hit Highest Level Since 1999
The yield on UK 10-year government bonds has reached 5.41%, the highest level in 19 years, and the £4.25 billion auction cost is the highest since 1999.
Worse than 2008? Outside the AI bubble, the new fund supported by "The Big Short" Michael Burry targets risks in private credit.
While Wall Street is busy searching for signs of a bubble in AI stocks, a new hedge fund connected to 'Big Short' Michael Burry is turning its attention to another potentially more dangerous area—private credit.
Tesla approved to launch autonomous driving software in Croatia
The euro is approaching its yearly low against the US dollar: hit by energy shocks and European political risks, it has fallen about 2% this month.
The resilience of the euro against the U.S. dollar is being tested by energy prices and political risks.
